A machined-part quotation is only as good as its RFQ package: the drawing with its revision letter and a 3D model, material and grade, the tolerancing standard (for example ASME Y14.5), surface finish and coating, heat treatment, the inspection document for the material, annual volume and lot size, and the first-article requirement. EUROMEXA supplies machined parts made to that drawing in Mexico, quoted within 24–72 hours.
EUROMEXA is an independent supplier, not an authorised distributor or affiliate of any manufacturer named here; brand names identify compatibility only.
RFQ package checklist
| Item | Why it matters |
|---|---|
| 2D drawing with revision letter, and the 3D model (STEP) if you have one | The quotation and the first article refer to one revision; the model speeds up programming |
| Material and grade (and an acceptable alternative, if any) | Drives cost and availability; an alternative must be approved by you in writing |
| Material inspection document, for example EN 10204 type 3.1, if required | Says what evidence of the material comes with the parts |
| Tolerancing standard and general tolerances (title block) | ASME Y14.5 or the ISO standard on the drawing; it decides how the part is inspected |
| Critical-to-function dimensions marked | Inspection effort goes where it matters |
| Surface finish (Ra), coating or plating, heat treatment | Often done in a separate process; each one changes price and lead time |
| Annual volume, lot size and first-order quantity | Decides the process and the price by volume |
| First-article and quality requirements (FAI report, PPAP level, sampling plan) | Agreed before production, not after |
| Packaging, marking and delivery place | Protects finished surfaces and decides the Incoterm |
Castings, forgings and plastic parts
For castings and forgings, add the casting or forging drawing, the material standard, and any non-destructive testing required. For injection-moulded plastic parts, add the resin grade, colour, annual volume and who will own the mould. The same rule applies: one revision, written requirements, a first article approved by you before production.
First article and production approval
- A first-article inspection report measures every characteristic on the drawing for the first parts
- Automotive buyers often require PPAP, AIAG's production part approval process, at a level they specify
- Production follows only after you approve the first article; drawing changes restart the approval for the affected characteristics
- Each lot is checked against the approved first article before shipment, by an independent inspection company where the order justifies it
What EUROMEXA quotes
- One quotation from EUROMEXA: price by volume, minimum order, production lead time, Incoterm and what the first article includes
- Questions on the drawing come back to you in writing before the quotation
- Delivery with commercial invoice, packing list, certificate of origin where applicable, and the inspection documents agreed
- Payment: first orders are paid in advance or with a deposit; credit terms are available for established accounts
Questions and answers
- What do I need to send for a machined-part quotation?
- The drawing with its revision letter, a 3D model if available, material and grade, tolerancing standard, finish, heat treatment, annual volume and the first-article requirement.
- Can EUROMEXA quote from a sample without a drawing?
- Send the sample's photos and dimensions; EUROMEXA tells you what is needed to quote it. A drawing agreed by you is needed before production.
- What is an EN 10204 3.1 document?
- A type of inspection document for metallic materials defined in EN 10204:2004; the drawing or order states which type is required.
- Do you supply PPAP documents?
- Where your order specifies PPAP and its level, the quotation states it and the documents come with the first-article approval.
- Who owns the drawing and tooling?
- You keep your drawings. Ownership of any dedicated tooling is stated in the quotation and the contract.
Sources
- ASME: Y14.5 — Dimensioning and Tolerancing (Third party; checked 2026-11-17)
- EVS (Estonian Centre for Standardisation): EN 10204:2004 — Metallic materials: types of inspection documents (Third party; checked 2026-11-17)
- AIAG (Automotive Industry Action Group): Production Part Approval Process (PPAP) (Third party; checked 2026-11-17)
Last checked 2026-11-17.