Skip to content

English–Spanish glossary of industrial parts, tender and trade terms

A spare part is a refacción in Mexico and a repuesto in most other Spanish-speaking countries; a nameplate is the placa de datos; discontinued is descontinuado; a tender is a licitación and a quotation a cotización. This glossary pairs the English and Spanish terms buyers use for industrial parts, projects and trade, with short definitions and the Incoterms® rules as ICC publishes them.

EUROMEXA is an independent supplier, not an authorised distributor or affiliate of any manufacturer named here; brand names identify compatibility only.

Terms

EnglishEspañolDefinition
Spare partRefacción / repuestoA part bought or kept to replace a failed or worn part of a machine. In Mexico the usual word is refacción; in most other Spanish-speaking countries, repuesto.
Part number / order numberNúmero de parte / número de pedidoThe manufacturer's identifier for one product version, including suffixes; Siemens calls it the order number (MLFB). It is not the serial number.
Serial numberNúmero de serieIdentifies one individual unit. Engines and machines are often identified by it when ordering parts.
Nameplate / rating platePlaca de datosThe label or plate on a unit that shows the manufacturer, part number, revision and ratings. Start a request with a clear photo of it.
Revision / versionRevisión / versiónThe letter or number that distinguishes changes to the same part number, such as hardware revision or firmware version.
DiscontinuedDescontinuadoNo longer sold by the manufacturer as a new product. Each manufacturer defines its own lifecycle stages; see the lifecycle-terms guide. [2] Rockwell Automation
ObsoleteObsoletoCommonly used for a product that is discontinued and no longer supported; the manufacturer's own status term is the reference. [3] Siemens AG
Last-time buyÚltima compraThe final opportunity a manufacturer announces to order a product before it stops selling it.
Successor / migrationSucesor / migraciónThe current product the manufacturer names to replace a discontinued one, and the work needed to change over.
New surplusNuevo excedenteAn unused part from someone's surplus inventory, not bought new from the manufacturer's channel; condition and packaging are stated.
New old stock (NOS)Nuevo de inventario antiguoAn unused part made years ago and kept in storage, often in its original packaging.
Used / pulled from serviceUsado / retirado de servicioA part removed from working equipment; its condition and whether and how it was tested are stated.
RefurbishedReacondicionadoA used part restored by a named repairer, with a statement of what was done and any test report.
Exact match / alternativePieza exacta / alternativaAn exact match has the same part number and revision; an alternative is a different part proposed with evidence and only with the buyer's agreement.
Drive / variable frequency drive (VFD)Variador / variador de frecuenciaElectronic equipment that controls the speed of an AC motor by varying frequency and voltage.
Servo drive / servo amplifierServoamplificador / servovariadorThe drive that controls a servo motor's position, speed and torque from feedback.
PLC (programmable logic controller)PLC / controlador lógico programableThe industrial computer that runs a machine's or line's control program, with its CPU, power supply and I/O modules.
HMI / operator panelHMI / pantalla de operadorThe screen or panel through which an operator runs and monitors a machine.
Authorised distributorDistribuidor autorizadoA company appointed by a manufacturer to sell its products; the manufacturer's warranty and support usually depend on buying through it.
Independent supplierProveedor independienteA supplier that is not an authorised distributor of the brands it supplies. EUROMEXA is one, and says so on every page.
QuotationCotizaciónThe supplier's written offer: what is supplied, price, lead time, Incoterm and conditions. Nothing is ordered until the buyer accepts it.
Lead timeTiempo de entregaThe time from order to delivery at the agreed place, stated in the quotation.
Tender / invitation to bidLicitaciónA formal procedure in which a buyer invites offers against published documents and evaluates them by stated rules.
Tender documentsBases de licitación / pliegoThe documents that define what is bought, how offers are submitted and how they are evaluated.
Bill of quantities (BoQ)Lista de materiales / catálogo de conceptosThe itemised list of what a project needs, with quantities, which the offer prices line by line.
Request for clarificationSolicitud de aclaraciónA written question to the buyer about the tender documents, answered in writing to all bidders.
Type testEnsayo de tipoA test of a product design against a standard, done once for the design rather than on every unit.
DatasheetFicha técnicaThe manufacturer's document with a product's characteristics and ratings.
First article inspectionInspección de primer artículoMeasurement of the first parts made against every characteristic of the drawing, approved before production.
Incoterms® rulesReglas Incoterms®Eleven three-letter trade terms published by the International Chamber of Commerce; the current version is Incoterms® 2020. [1] International Chamber of Commerce (ICC)
EXW (Ex Works)EXW (En fábrica)The seller makes the goods available at its premises; the buyer bears the costs and risks from there, including export clearance. [1] International Chamber of Commerce (ICC)
FCA (Free Carrier)FCA (Franco transportista)The seller delivers the goods, cleared for export, to the carrier named by the buyer at the agreed place; risk passes there. [1] International Chamber of Commerce (ICC)
CIP (Carriage and Insurance Paid To)CIP (Transporte y seguro pagados hasta)The seller pays carriage and insurance to the named destination; risk passes when the goods are handed to the first carrier. [1] International Chamber of Commerce (ICC)
DAP (Delivered at Place)DAP (Entregada en lugar)The seller delivers the goods ready for unloading at the named place; the buyer clears import and pays duties. [1] International Chamber of Commerce (ICC)
DDP (Delivered Duty Paid)DDP (Entregada derechos pagados)The seller delivers the goods cleared for import, duties paid, at the named place. [1] International Chamber of Commerce (ICC)
Importer of recordImportadorThe party responsible for the import declaration and duties. Under FCA, CIP or DAP it is the buyer.
Customs brokerAgente aduanal / agencia de aduanasA licensed professional or firm that clears goods through customs for the importer.
Commercial invoice / packing listFactura comercial / lista de empaqueThe seller's invoice for the goods and the list of packages and their contents; both are needed for import.
Certificate of originCertificado de origenA document stating where goods were made, used to claim preference under a trade agreement where one applies.

Refacción, repuesto or recambio: which word where?

All three mean a spare part. Refacción is the usual word in Mexico; repuesto is understood across Latin America and is the usual word in most countries; recambio is common in Spain. EUROMEXA's Spanish pages say "refacciones y repuestos" so every reader finds the word they search for.

How to use the glossary in a request

  • Write the part number exactly as on the nameplate, in any language: numbers do not need translating
  • Name the condition you accept with these terms (new surplus, used, refurbished) so the quotation answers the same question
  • State the Incoterm and the named place: the rule decides who pays freight, insurance and duties

Questions and answers

What is the difference between refacción and repuesto?
None in meaning: both are a spare part. Refacción is the usual word in Mexico; repuesto in most other Spanish-speaking countries.
What is new surplus vs new old stock?
New surplus is an unused part from someone's surplus inventory; new old stock is an unused part made years ago and kept in storage, often in its original packaging.
How do you say nameplate in Spanish?
Placa de datos. Start a parts request with a photo of it.
Which Incoterms® version is current?
Incoterms® 2020, published by the International Chamber of Commerce: eleven three-letter rules.
What is a bill of quantities in Spanish?
Lista de materiales; in Mexican public works it is often called catálogo de conceptos.

Sources

  1. International Chamber of Commerce (ICC): Incoterms® rules (Incoterms® 2020) (Third party; checked 2026-11-17)
  2. Rockwell Automation: Legacy product support: product lifecycle stages (Manufacturer; checked 2026-11-16)
  3. Siemens AG: Product Lifecycle States (PRODIS, status 29.12.2009) (Manufacturer; checked 2026-11-16)

Last checked 2026-11-17.

Request a quotation from EUROMEXA

Send the part number or a nameplate photo. You receive EUROMEXA's quotation — price, lead time and Incoterm — or a list of what is still needed, within 24–72 hours. Partial information is fine to start. Nothing is ordered until you accept a written quotation.

Payment: first orders are paid in advance or with a deposit; credit terms are available for established accounts.